CRUDE OILFIELD SOLUTIONS PRIDES ITSELF ON DELIVERING THE HIGHEST QUALITY SERVICE SO THAT WE CAN MAINTAIN STRONG PARTNERSHIPS FOR THE LONG TERM. TYPICALLY, WHEN YOU BUY THE BEST IT COSTS YOU MUCH MORE, HOWEVER WE'VE BEEN ABLE TO FLIP THIS MODEL ON IT'S HEAD WITH OUR DRILLING VS. DAYS (D.v.D.) PHILOSOPHY. 

noun_Calendar Remove_1022874.png
noun_problem_2207385.png
noun_Sound Wave_89710.png

WHAT IS DRILLING VS. DAYS?
 

SIMPLY PUT, IT'S THE NET BENEFIT SAVINGS FOR FINISHING PROJECTS "DAYS" FASTER INSTEAD OF HIRING CHEAPER HOURLY RATE DRILLING SERVICES. WHEN DAYS ARE SHAVED OFF OF AFE, THE SAVINGS ARE EXPONENTIALLY MAGNIFIED FOR OPERATORS VERSUS SAVING ON AN HOURLY RATE BUT TAKING LONGER (OR HAVING PERFORMANCE/PRODUCTION ISSUES). 

 

CHEAPER HOURLY RATE WORKERS ARE GENERALLY CHEAPER FOR A REASON. THIS OFTEN RESULTS IN COST LOSS IN MULTIPLE WAYS: 

THE PROJECTS TAKE "DAYS" LONGER: BECAUSE THEY ARE INCENTIVIZED TO RIDE-THE-CLOCK AND ACCUMULATE HOURS FOR THEIR COMPANY (AND THEIR OWN POCKETBOOK), THEIR INTERESTS ARE NOT ALIGNED WITH OPERATORS. IN FACT, THETY ARE DIAMETRICALLY OPPOSED! ALSO, THESE GROUPS DO NOT ALWAYS HAVE IMMEDIATE ACCESS TO THE REQUIRED TOOLS/MOTORS (OR THE MOST EFFICIENT TOOLS) AND WILL OFTEN BE FORCED TO WAIT FOR DELIVERY COSTING OPERATORS EVEN MORE DELAYS.

PROJECTS EXPERIENCE ISSUES: THE CHEAP LABOR MODEL ONLY WORKS WITH HIRING "BOTTOM OF THE BARREL" DIRECTIONAL DRILLERS BECAUSE OF THEIR COST BASIS REQUIREMENTS. THIS LACK OF EXPERIENCE OR EXPERTISE OFTEN RESULTS IN ADDITIONAL COSTS LIKE DOGLEG CORRECTIONS (SEE HOW MUCH A DOGLEG CAN COST A COMPANY HERE). ALSO, DUE TO THE CUT-RATE SERVICE MODEL, THE BEST EQUIPMENT IS NOT UTILIZED OR SERVICED PROPERLY. UTILIZING IMPROPER EQUIPMENT AND LENGTHENING OF PROJECTS CREATES MORE OPPORTUNITY FOR SAFETY ISSUES.

✓ COMMUNICATION GAPS: AS A CONSEQUENCE OF POOR PERFORMANCE, CUT-RATE DD'S OFTEN SLOW-PLAY INFORMATION AND PLACE BLAME IN ORDER TO STAY ON THE JOB LONGER. THE LONGER A PROJECT TAKES, THE MORE COMMUNICATION THAT IS REQUIRED AS A MATTER OF LOGIC. THIS COMPOUNDS THE COMPLEXITY OF AN ALREADY INEFFICIENT OPERATIONAL METHODOLOGY AND CREATES MORE COST-LEAKAGE.

CRUDE'S

D.V.D. MODEL

THE D.V.D. MODEL WE HAVE PERFECTED IS DESIGNED TO WORK DIRECTLY IN CONCERT WITH THE INTERESTS OF OIL OPERATORS BY SAVING TIME, INCREASING PRODUCTIVITY, PROVIDING TRANSPARENCY IN COMMUNICATIONS AND MOST OF ALL, SIGNIFICANTLY MITIGATING RISK AND REDUCING OVERALL COST.

USE THE SLIDER TO SEE SAVINGS PER DAYS SAVED

THIS ILLUSTRATES SAVINGS ON DIRECTIONAL DRILLING SERVICES ONLY AT STANDARD RATES AND DOES NOT ACCOUNT FOR PRODUCTION LOSS, COST OF ERRORS, NPT AND OTHER FACTORS THAT MAY INCREASE THIS AMOUNT SUBSTANTIALLY.

HOW DOES IT WORK?

WE SOURCE THE INDUSTRY'S BEST TALENT, THE LATEST EQUIPMENT, THE BEST ENGINEERING AND GEOLOGICAL TEAM, TOP FLITE ACCOUNT EXECUTIVESHIP AND COMPENSATE THEM WELL ABOVE INDUSTRY AVERAGE! THEY ARE INCENTIVIZED BY DELIVERING QUALITY ON TIME (QOT) AND NOT RIDING THE CLOCK. BY SAVING OUR CLIENTS HUNDREDS OF THOUSANDS ON EACH PROJECT, WE ARE ABLRE TO ESTABLISH LONG-TERM AND ONGOING RELATIONSHIPS WITH THE BEST OIL ORGANIZATIONS IN THE WORLD! IT'S A TRULY SYNERGISTIC APPROACH BETWEEN OPERATORS, DIRECTIONAL ORGANIZATIONS AND EMPLOYEES THAT WE BELIEVE WILL ULTIMATELY BE AN INDUSTRY STANDARD.